Australia: Residential Focus: In the media, published articles, practice and courts, cases and legislation

Last Updated: 22 May 2019
Most Read Contributor in Australia, July 2019

In the media

ACT resists new national building standards
The ACT government continues to resist adopting the new national building standards, claiming the building industry needs more time to adjust. Meanwhile, all other states and territories signed up to the 2019 Building Code of Australia on May 1 (03 May 2019). More...

Industry strengthens call for compulsory registration of engineers
Engineers Australia has re-stated the case for compulsory registration in a submission to the Opposition, ahead of the possibility of Victoria's Parliament considering the Professional Engineers Registration Bill 2019 this week (30 April 2019). More...

The biggest ever change to building Green Star ratings
The Green Building Council of Australia (GBCA) is preparing to evolve its Green Star rating system, encouraging the built environment to achieve net zero carbon emissions (30 April 2019). More...

Construction activity cools across Asia Pacific to start 2019
Data from the RICS Construction and Infrastructure Survey indicates a more subdued environment across the Asia Pacific region to start 2019 (30 April 2019). More...

Construction, waste management facing tough time
The construction industry and recycling and waste management operators face surging premiums and challenges obtaining cover, Honan warns in a quarterly market update (29 April 2019). More...

Complexity, safety drive construction management software demand
Increasing project complexity and an ongoing push for safer work sites are driving greater demand for construction management software in Australia; a global industry leader says (29 April 2019). More...

CSIRO opens up new housing portal
The Commonwealth Scientific and Industrial Research Organisation (CSIRO) has launched a new data portal to centralise information relating to Australian homes as part of a program to make them more energy efficient (26 April 2019). More... 

Skilled migration crucial to housing: HIA
Recent proposals to make changes to the '457' skilled working visa will not address the bigger problem of how to fill the shortage of skilled trades people available to build new homes and apartments, according to HIA Managing Director, Graham Wolfe (26 April 2019). More...

Dwelling approvals rise in February
A rise in building approvals for apartments and townhouses has driven a 0.4 per cent increase in the total number of dwellings approved in Australia in February 2019, in trend terms, according to data released by the Australian Bureau of Statistics (ABS) (24 April 2019). More...

NSW electricians sail through licence Tests
Electricians throughout the residential building sector in NSW have largely sailed through checks to ensure that they have valid licences, indicating a high level of compliance with licensing rules in that state (30 April 2019). More...

Newcastle building company found guilty of failing to protect workers from falls
A Newcastle building company has been found guilty of failing to provide adequate fall protection to avoid its workers from falling from heights. The prosecution comes after a SafeWork inspector attended a construction site run by DSD Builders Pty Ltd (DSD Builders) in Speers Point on 27 March 2018 (30 April 2019). More...

Unlicensed contractor fined $67,000 for breaking home building and consumer laws
A Western Sydney man has been fined $67,000 after being found guilty of accepting multiple payments from consumers while unlicensed and then performing unfinished and defective residential work (30 April 2019). More...

Northern Beaches carpenter convicted of repeat offences under Home Building Act
NSW Fair Trading has successfully prosecuted a Northern Beaches repeat offender for multiple breaches of home building laws. Denny Shallis, who traded as Koala Carpentry at Collaroy Plateau, was sentenced and fined $19,600 at Parramatta Local Court on 11 April under the Home Building Act 1989(29 April 2019). More...

Fair Trading shines a light on electrical workers in building sector
Operation Switch', an investigation led by NSW Fair Trading officers, identified high levels of compliance across businesses within the NSW residential building sector. It is an offence to perform electrical wiring work without a licence or certificate and workers can be fined $22,000 as an individual or $110,000 as a company (23 April 2019). More...

Published

Australian Bureau of Statistics
3 May 2019 Building Approvals, Australia, Mar 2019 (cat no. 8731.0) 

Practice and courts

ABCB reminder: NCC 2019
NCC 2019 will be adopted from 1 May 2019. If you'd like an overview of the key changes and dates, please check out the latest ABCB Connect article. More...

HIA: National Construction Code (NCC) 2019 starts
HIA has developed a range of member resources and ran a series of seminars to assist members in understanding and applying the changes. You can get access to these resources here. You can download the new editions of the NCC from the ABCB website or if you want a hard copy you can get this from the HIA website here.

GBCA important deadlines - Green Star certification for your project
Many project teams have timelines set around major events. To support this, these guidelines below (based on typical time frames), which specify the deadlines you'll need to meet in order to have your project certified in time for key milestones in 2019. Deadline is 4 November 2019. More...

City of Sydney: Alternative Housing Idea Challenge
The community will have the opportunity to provide feedback on the short-listed concepts as part of the City's consultation to shape Sydney 2050. More...

Hoisting and construction activities in public spaces
The City of Sydney is seeking feedback on proposed new approval processes, controls and responsibilities when operating and working in public places. The draft local approvals policy and code of practice: hoisting and construction activities in public places provides information for property owners, builders and contractors. The deadline for submissions is 15 May 2019.

New dates for Environmental Planning & Assessment Act updates
Councils, certifiers and other industry practitioners have more time to implement some of the recent Environment Planning & Assessment Act updates. Changes affect new provisions for building and subdivision certification, local strategic planning statements for councils in the Greater Sydney Region and community participation plans

Cases

K&J Vision Pty Ltd v Jows Construction Pty Ltd [2019] NSWCATAP 112
APPEALS - Home building contract – outstanding progress claims – repudiation of contract – termination of contract – calculation of damages for breach - adequacy of reasons - error of law.
Corporations Act 2001 (Cth), s 1335; Home Building Act 1989 (NSW), ss 92, 96, 99; Home Building Regulation 2004, cl 56.

Service Today (NSW) Pty Ltd & Magerovski v Commissioner for Fair Trading [2019] NSWCATAP 113
ADMISTRATIVE LAW – review of decision to cancel licenses under the Home Building Act, 1989 – denial of procedural fairness – review of answers given to show cause notice – use of subsequent evidence to demonstrate answers false or misleading – penalty – reference to cases – parity principle.

Visual Building Construction Pty Ltd v David Armistead [2019] NSWCA 92
PRACTICE – appeal – security for costs – corporate appellant – Corporations Act 2001 s 1335 – where reason to believe appellant unable to pay costs – where no reason not to grant security – no question of principle.

Bundanoon Sandstone Pty Ltd v Cenric Group Pty Ltd; TWT Property Group Pty Limited v Cenric Group Pty Limited [2019] NSWCA 87
APPEAL – contract – where parties entered into various contractual arrangements to undertake excavation works including harvesting natural sandstone – whether the primary judge erred in finding the parties formed a concluded agreement to vary the terms of the head contract and the sub-contract – where credit findings are challenged – importance of establishing a Fox v Percy type error APPEAL – contract – whether the primary judge erred in finding the cross-appellant's show cause notice and termination of the head contract were invalid – effect of variation of the head contract – whether the primary judge erred in finding a breach of an implied term of good faith and reasonableness APPEAL – contract – where parties entitled to share in royalties from sale of sandstone – whether the primary judge's construction of the term capping the contractor's share of the royalties was wrong. Environmental Planning and Assessment Act 1979 (NSW), s 96.
Uniform Civil Procedure Rules 2005 (NSW), r 42.1, Pt 51.36(2).

Hu v Kim [2019] NSWSC 448
Defendants to pay plaintiffs' costs; Cross-claim to be dismissed.
COSTS — Party/Party — General rule that costs follow the event — Application of the rule and discretion — Defendants conduct of proceedings unreasonable notwithstanding settlement at hearing.
GUARANTEE AND INDEMNITY — Indemnities — Construction — Whether liability "as a result of" specified contract.
The consent orders which I made as between the plaintiffs and the defendants were: (b) engaging a licensed and qualified builder who meets the requirements of Part 6 of the Home Building Act to carry out building works in accordance with the Building Code of Australia.

Wassef v Panagiotopoulos [2019] NSWCATAP 101
(1) Leave to appeal is refused. APPEAL – Interlocutory decision - Leave to appeal – no issue of principle.
Civil and Administrative Tribunal Act 2013; Civil and Administrative Tribunal Rules 2014; Home Building Act 1989.

Kapeller v BH Australia Constructions Pty Ltd [2019] NSWCATAP 104
COSTS – costs to follow the event.

G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd (No 2) [2019] NSWSC 463
COSTS – party/party – costs orders in interlocutory proceedings – whether costs should be payable forthwith.

Lawrence v Ciantar; Ciantar v Lawrence [2019] NSWSC 464
CONTRACTS – written terms – oral terms – construction – whether plaintiff contractually obliged to carry out and complete certain works – whether joint venture agreement or contract caught by Home Building Act 1989 (NSW).
CONTRACTS – interpretation – ambiguity – evidence of surrounding circumstances – evidence of prior negotiations – evidence of subsequent conduct.
STATUTORY INTERPRETATION – definitions – Home Building Act 1989 (NSW) – meaning of "residential building work" – contract to do sub-division works including construction of a driveway, retention tank and drainage works – whether preparatory works under contract constituted "residential building works".
Home Building Act 1989 (NSW) ss 4, 6, 7, 7BA, 7D, 10; sch 1 cls 1, 2, 3.

Menaker v Adambuilt Pty Ltd [2019] NSWCATAP 117
APPEAL – consent orders – whether basis on which to set aside - joinder of additional party – whether denial of procedural fairness – whether significant new evidence not reasonably available.

Indorato v Ottaviano t/as Transbuild Construction [2019] NSWCATAP 115
Leave to appeal – clause 12 of schedule 4 of the Civil and Administrative Tribunal Act 2013.

Legislation

Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2019
02/05/2019 – This instrument exempts the models specified in the Schedule to the instrument from the testing requirements of section 6 of the Greenhouse and Energy Minimum Standards (Air Conditioners and Heat Pumps) Determination 2013. Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2019.

This publication does not deal with every important topic or change in law and is not intended to be relied upon as a substitute for legal or other advice that may be relevant to the reader's specific circumstances. If you have found this publication of interest and would like to know more or wish to obtain legal advice relevant to your circumstances please contact one of the named individuals listed.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Similar Articles
Relevancy Powered by MondaqAI
 
Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Mondaq Free Registration
Gain access to Mondaq global archive of over 375,000 articles covering 200 countries with a personalised News Alert and automatic login on this device.
Mondaq News Alert (some suggested topics and region)
Select Topics
Registration (please scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions