United States: Five Years In The Making: California Is One Step Closer To A Comprehensive Update To The CEQA Guidelines

The Governor's Office of Planning and Research ("OPR") has spent five years drafting a comprehensive update to 30 sections of the California Environmental Quality Act ("CEQA") Guidelines.1 The updated text2 ("Final Text") ensures the Guidelines are consistent with recent court decisions, implements legislative changes, clarifies rules governing the CEQA process, and eliminates duplicative analysis. Several changes to the Guidelines address two hot button topics: global climate change and statewide affordable housing shortages. During the deliberative process, the Agency also released its "Final Statement of Reasons for the Regulatory Action Amendment to the State Guidelines" to give more history and context to each change to the Final Text.3

While a number of the amendments to the Guidelines simply codify the implementation of CEQA as currently required by case law, many of the changes will significantly alter the application of CEQA to future projects. The revised Guidelines will certainly cause lead agencies to be more proactive in their analysis of wildfire impacts, long-term greenhouse gas ("GHG") and energy impacts, baseline justifications and deferred mitigation. There is also a new Vehicle Miles Traveled ("VMT") methodology for assessing transportation impacts. Such programs and thresholds will likely dovetail with state and local efforts to meet GHG reduction targets set by the state or in local climate action plans. This comprehensive update, five years in the making, will undoubtedly improve the defensibility of CEQA documents moving forward.

The Office of Administrative Law ("OAL") completed its review of the Final Text on December 28, 2018. Once OAL files the Final Text with the Secretary of State (likely, the next few days), any CEQA documents not circulated for the statutory public review and comment period prior to January 1, 2019 must comply with the new content requirements. Any new procedural requirements will take effect 120 days after the new Guidelines are filed with the Secretary of State. The new VMT methodology will not be mandatory until July 1, 2020, unless implemented early by a lead agency, as has been done by the City of San Francisco. However, lead agencies should start planning now for their VMT-based thresholds, or start creating VMT mitigation banks to allow for new development to achieve some of VMT reductions off-site through contributions to regional transit projects that more efficiently reduce VMT.

A more detailed analysis of these changes follows.

Efficiency Improvements

A New and Improved Environmental Checklist – The Final Text updates and reorganizes the environmental checklist (Appendix G) most agencies use to format and guide their environmental review.4 The modifications to the checklist:

  • Eliminate redundant questions so lead agencies are not required to repeat analysis in subparts of the same impact category;
  • Add new transportation questions that focus lead agencies on evaluating impacts on VMT,5 pursuant to requirements, however, that will not be in effect in most places until July 1, 2020
  • Add new wildfire questions, reminding lead agencies that, while CEQA does not require analysis of the impact of the environment on a project (a.k.a. "reverse CEQA"), CEQA does require an analysis when a project exacerbates an environmental impact, e.g., wildfire risk;
  • Add energy as an impact category for MNDs (and not just EIRs) with new questions requiring analysis of a project's energy consumption and compliance with state or local energy laws;
  • Clarifies that both state and federal wetland impacts must be evaluated;
  • Clarifies that public, not private, view impacts are relevant to a CEQA analysis; and
  • Moves paleontological resource impacts out of cultural and into the geologic resource section, in accordance with AB 52.

Use of Existing Regulatory Standards – The Final Text promotes use of existing regulatory standards as "thresholds of significance" in the CEQA process, even on an informal, case-by-case basis.6 This change codifies case law7 allowing agencies to rely on the expertise of another regulatory body, without foreclosing consideration of possible project-specific effects.

Program EIR Tiering – Among the most efficient, but underutilized, methods for expediting subsequent CEQA review and avoiding duplicative analysis, is the "within the scope" method for analyzing a project covered by a Program EIR.8 Recognizing that recent case law showed that the existing Guidelines lacked clarity regarding "within the scope" analysis, the Final Text identified factors (consistency with the Program EIR's land use, overall density and intensity, geographic area, and covered infrastructure) courts have used to uphold a lead agency's "within the scope" environmental checklist.9

Emergency Project Exemption – The Final Text clarifies that projects requiring a "reasonable amount" of planning can qualify under CEQA's current exemption for emergency repairs.10 The exemption is also clarified to provide that it is not limited to unexpected emergencies, and identifies factors for certain imminent emergencies.

Existing Facilities Exemption – In order to promote redevelopment of vacant buildings, the Final Text clarifies that a project's prior use history can be considered when determining whether it would result in an expansion of an existing use. The Final Text also clarifies that this exemption includes improvements to the public right-of-way that enable use by multiple modes of transportation.11 These clarifications are intended to encourage infill and transit-oriented development.

"Common Sense" Exemption – Under the Final Text, the "general rule" that an activity is exempt from CEQA if there is no possibility that activity may have a significant effect on the environment is now referred to as the "common sense" exemption to match the language used by the California Supreme Court.12

<Judicial Remedies – Relying on several CEQA cases,13 the Final Text emphasizes that courts have the equitable discretion to void only parts of a project approval and to suspend only certain project activities that preclude consideration of mitigation measures and alternatives; or to require the lead agency to take specific actions to bring the project into CEQA compliance.14 It also affirms that CEQA-compliant portions of the EIR need not be reevaluated if consistent with the principles of res judicata. In other words, when the proposed project is not changed, there is no "second bite at the apple" on issues that were not raised or that were successfully defended. Changing the project can open up new issues, of course, but the agency generally need not expand its analysis beyond what a court specified needed to be fixed.

Substantive Improvements

Energy Impacts – The Final Text provides new guidance for analyzing a project's impacts due to "wasteful, inefficient, or unnecessary consumption of energy."15 An EIR's energy analysis must now address not only building design and Title 24 green building code compliance, but also transportation, equipment use, location, renewable energy features that could be incorporated into the project, and other relevant factors.

Water Supply Impacts – The Final Text clarifies the standards for an adequate water supply assessment, including an analysis of possible sources of water supply over the life of a project and the environmental impacts of supplying that water to that project. The analysis must also consider any uncertainties in supply, as well as potential alternatives and other environmental impacts of using these alternatives.16 Following on the heels of one of the worst water crises in California history, these requirements will assume additional importance in many jurisdictions.

Transportation Impacts and New VMT Methodology – In perhaps the most significant substantive change to the Guidelines, the Final Text adopts an alternative methodology for analyzing the significance of transportation impacts.17 The Agency determined that the current level of service ("LOS") methodology, which analyzes traffic congestion, tends to promote increased vehicle use, jeopardizing the ability to realize GHG emissions reduction goals. Guidelines section 15064.3 therefore adopts a new methodology focusing on a project's effect on VMT. While the Agency believes VMT methodology will promote project designs that reduce reliance on automobile travel, this section still permits lead agencies to use discretion when selecting alternative methodologies for determining transportation impacts, including LOS, for projects intended to increase roadway capacity.

The Agency noted that the second greatest category of household expenditures after housing itself is a family's transportation costs. The Agency believes the shift to VMT analysis will save households approximately $2,000 a year by reducing VMT and spurring more infill and transit-oriented development. The updated Guidelines will also help streamline the development process for housing projects in low-VMT and transit-oriented locations, thereby helping increase the supply of housing options in areas with low transportation costs.

Greenhouse Gas Emissions – The Final Text revises the CEQA Guideline addressing GHG emissions to clarify the appropriate methodology for a GHG analysis consistent with recent case law.18 The revisions recognize that GHG-related climate change is a global problem and that no individual project is likely to have a significant direct impact on climate change Accordingly, the lead agency should focus its analysis on whether a project's incremental contribution to GHG emissions would have a cumulatively considerable19 effect on climate change. Moreover, the Final Text emphasizes the importance of: (a) analyzing long-term GHG impacts when the project has a long time horizon for implementation; and (b) accounting for evolving scientific knowledge and regulatory schemes. The changes also clarify that, if relying on consistency with state goals and policies to determine significance, the lead agency should explain how the project's emissions are consistent with those goals and support this position with substantial evidence.

Technical Improvements

Exacerbating Existing Environmental Hazards/Reverse CEQA Prohibition – The Final Text provides guidance for when agencies must consider the effects of locating projects in hazardous or vulnerable locations.20 A lead agency is not required to perform "reverse CEQA analysis" (analyzing the impacts of the existing environment on the project and its future users) unless the project has a reasonably foreseeable risk of exacerbating existing environmental hazards. This includes any cumulative effect the project would have on a hazardous condition. This means that a lead agency should consider a project's potential for increasing the severity of hazards over time, including hazards that are expected to be more severe in the future due to climate change. However, a lead agency need not conclude any indirect impacts from environmental hazards are significant or engage in speculative analysis of such impacts.

Baseline – The Final Text eliminates any limitation of the baseline to those conditions existing at the time the Notice of Preparation ("NOP") is published. It may be appropriate to use projected future conditions or representative past conditions as the environmental baseline when use of existing conditions would be either misleading or without informative value to decision-makers and the public.21 In such instances, the Final Text requires the lead agency to expressly justify its decision not to use existing conditions, and support that justification with substantial evidence in the record. This change also allows a lead agency to describe both existing and future conditions. These changes facilitate the ability of the lead agency to present a more accurate picture of a project's actual impacts.

Deferred Mitigation – Another change addresses when agencies may defer specific details of mitigation measures until after project approval.22 Specifically, the Final Text permits "deferred mitigation" when the lead agency: "(1) commits itself to the mitigation, (2) adopts specific performance standards the mitigation will achieve, and (3) identifies the type(s) of potential action(s) that can feasibly achieve that performance standard and that will be considered, analyzed, and potentially incorporated in the mitigation measure." Notably, while commitment to the performance standard is required, this change does not require the lead agency to commit to an approved menu of measures from which the implemented mitigation must be selected. Rather, the menu may be a non-exclusive list of examples.

General Responses to Data Dumping –The Final Text also includes changes related to the duty of lead agencies to provide detailed responses to comments on a project.23 The changes clarify that a general response may be appropriate when a comment is general in nature, or when a commenter submits voluminous data and information without explaining its relevance to the project ("data dumping"). A lead agency may also now provide proposed responses to public agency comments in electronic form.

Pre-Commitment Activities – The Final Text acknowledges that certain activities will occur prior to CEQA compliance and project approval. The revised Guidelines recognize that these actions fall on a spectrum between mere interest in a project and a commitment to a definite course of action, and that circumstances surrounding the activity are relevant to the determination of whether an agency has, as a practical matter, committed to a project.24 The Final Text permits approval of agreements that (a) do not foreclose any mitigation measures or project alternatives; and (b) are conditioned on completion of CEQA review. As such, it provides a useful roadmap for how to draft a pre-commitment agreement so it does not preclude mitigation measures and alternatives.

Noticing to County Clerk – The Final Text corrects an inconsistency with the Public Resources Code, and now requires posting of the NOP in the office of the County Clerk of each county in which the project will be located as well as a transmittal of the NOP to OPR.25

Discretionary versus Ministerial – The Final Text clarifies the definition of "discretionary" to reflect various cases distinguishing this term from "ministerial."26 Specifically, the Final Text states a discretionary project is one in which a public agency can shape the project in any way to respond to concerns raised in an environmental impact report. This clarification is necessary to maintain consistency in determining "discretionary" projects and to improve practitioners' ability to identify when a project is required to undertake environmental review under CEQA. For example, the Agency clarified that review of projects in areas zoning specifies uses "by right" pursuant to Government Code sections 65583(a)(4) and 65583.2(b) cannot be discretionary

Lead Agency Determination – The Final Text increases the flexibility for determining the lead agency for a project by changing the word "shall" to "will normally" to clarify that where more than one public agency meets the criteria for being "lead agency," the agencies may agree to designate one entity as the lead.27

Footnote

1 14 C.C.R. § 15000 et seq.

2 http://resources.ca.gov/ceqa/docs/2018_CEQA_FINAL_TEXT_122818.pdf

3 http://resources.ca.gov/ceqa/docs/2018_CEQA_Final_Statement_of%20Reasons_111218.pdf.

4 A lead agencies is always permitted to use its own checklist(s).

5 See Senate Bill 743 (Steinberg, 2013).

6 14 C.C.R. §§ 15064,15064.7.

7 Communities for a Better Envt. v. Cal. Resources Agency (2002) 103 Cal.App.4th 98; see also Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal. App. 4th 1099.

8 14 C.C.R §§ 15152, 15168.

9 Citizens for Responsible Equitable Envt'l Dev. v. City of San Diego Redevelopment Agency (2005) 134 Cal.App.4th 598;Sierra Club v. County of Sonoma (1992) 6 Cal.App.4th 1307.

10 14 C.C.R § 15269; City of Solana Beach (2002) 103 Cal.App.4th 529.

11 14 C.C.R § 15301.

12 14 C.C.R. § 15061; Muzzy Ranch Co. v. Solano County Airport Land Use Com. (2007) 41 Cal.4th 372.

13 Neighbors for Smart Rail v. Exposition Metro Line Construction Authority (2013) 57 Cal.4th 439.

14 14 C.C.R. § 15234.

15 14 C.C.R. § 15126.2.

16 14 C.C.R. § 15155(f); Vineyard Area Citizens for Responsible Growth v. City of Rancho Cordova (2007) 40 Cal.4th 412.

17 14 C.C.R. § 15064.3.

18 14 C.C.R. § 15064.4; Cleveland Nat'l Forest Found. v. San Diego Ass'n of Gov'ts (2017) 3 Cal.5th 497; Ctr for Biological Diversity v. Dept. of Fish & Wildlife (2015) 62 Cal.4th 204.

19 "Cumulatively considerable" means that the incremental effects of an individual project are considerable when viewed in connection with the effects of past, current, and probable future projects.

20 14 C.C.R. § 15126.2(a); Cal. Building Indus. Ass'n v. Bay Area Air Quality Mgmt Dist. (2015) 62 Cal.4th 369

21 14 C.C.R. § 15125; Neighbors for Smart Rail v. Exposition Metro Line Construction Authority (2013) 57 Cal.4th 439; Ass'n of Irritated Residents v. Kern County Bd. of Supervisors (2017) 17 Cal.App.5th 708.

22 14 C.C.R. § 15126.4.

23 14 C.C.R. § 15008.

24 14 C.C.R. § 15004; Save Tara v. City of W. Hollywood (2008) 45 Cal.4th 116.

25 14 C.C.R. § 15082.

26 14 C.C.R. § 15357; Friends of Westwood, Inc. v. City of Los Angeles (1987) 191 Cal.App.3d 259; Mountain Lion Found. v. Fish & Game Comm. (1997) 16 Cal.4th 105; San Diego Navy Broadway Complex Coalition v. City of San Diego (2010) 185 Cal.App.4th 924; Friends of Juana Briones House v. City of Palo Alto (2010) 190 Cal.App.4th 286.

27 14 C.C.R. § 15051.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Events from this Firm
28 Mar 2019, Other, San Francisco, United States

This discussion will also include strategies for adapting to this new era, including changes to licensing practices, 101 guidelines and prosecution, monetization strategies, venue changes, PTAB strategies and litigation defense.

11 Apr 2019, Other, Los Angeles, United States

Please join us for a lively conversation with industry leaders as they discuss and share their strategies for achieving gender parity in the workplace.

11 Apr 2019, Other, Los Angeles, United States

Announcing an extraordinary opportunity for our attorneys: an intensive two-day mediation boot camp taught by the best litigators and mediators in our field.

 
In association with
Related Topics
 
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Mondaq Sign Up
Gain free access to lawyers expertise from more than 250 countries.
 
Email Address
Company Name
Password
Confirm Password
Country
Position
Industry
Mondaq Newsalert
Select Topics
Select Regions
Registration (please scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions