India: Dispute Resolution In The Construction Industry

Last Updated: 20 September 2016
Article by Sudip Mullick, Yigal Gabriel and Niharika Dhall

Most Read Contributor in India, July 2019

Introduction

The construction industry worldwide is expected to grow approximately 85% by 2030 to 15.5 trillion with India, China and US accounting for 57% of the total growth.1 It is one of the major contributors to India's GDP and is expected to be the engine for overall development. However, the industry in India is plagued with delays and cost-overruns. As reported by the Ministry of Statistics, more than 295 infrastructure projects worth INR 150 crore have been delayed with overrun of more than INR 1 lakh crore.2 It can be reasonably presumed that time overrun would lead to cost overrun which in turn would lead to disputes. Thus, it is imperative to demystify the conundrum that is construction disputes to resolve issues efficiently and economically.

There are two primary means of resolving disputes through adjudication – litigation in the courts or arbitration. The preferred mode of dispute resolution in the construction industry is arbitration for three fundamental reasons: (a) efficiency of time; (b) confidentiality; and (c) control over the process of dispute resolution.

In India, there is a comprehensive legal regime in place – the Arbitration and Conciliation Act 1996 (Arbitration Act) to conduct arbitrations irrespective of who the party to the arbitration may be – a domestic entity or a foreign entity. Before the amendment to the Arbitration Act earlier this year, in construction contracts for large projects particularly with public sector undertakings (PSUs), the owner tended to control the arbitration proceedings entirely. The PSUs generally exercised this control through one-sided arbitration clauses in the contracts.

For example, under the Arbitration Act, the parties are free to agree on the procedure for the appointment of the arbitral tribunal.3 Based on this, the arbitration agreements with PSUs would provide that the managing director or employee of one of the parties to the dispute would be the arbitrator. For example, in an agreement between Bharat Petroleum Corporation Ltd and Ace Pipeline Contracts Private Ltd dated 10 June 2002 pertaining to the Mumbai-Manmad Pipeline Extension Project, the arbitration agreement read: "Any dispute or difference of any nature whatsoever [or] any claim, cross-claim, counterclaim or set-off of the Corporation against the vendor or regarding any right, liability, act, omission or account of any of the parties hereto arising out of or in relation to this agreement shall be referred to the sole arbitration of the Director (Marketing) of the Corporation or of some officer of the Corporation who may be nominated by the Director (Marketing)."4

Prior to the amendment, the Courts had time and again upheld the validity of such clauses. The mere fact that the arbitrator named in the arbitration agreement is an employee of one of the parties does not, ipso facto, raise a presumption of bias on the part of the arbitrator or disqualify the arbitrator under the Arbitration Act. Thus, heads of departments and directors, not associated with a contract could have been appointed as arbitrators.5

However this position has undergone a significant change with the 2016 amendment to the Arbitration Act (amended Arbitration Act) which, inter alia, provides that notwithstanding any prior agreement to the contrary, any person whose relationship, with the parties or counsel or the subject-matter of the dispute, falls under any of the categories specified in the Seventh Schedule (of the amended Arbitration Act) shall be ineligible to be appointed as an arbitrator.6 Thus, by virtue of the Seventh Schedule, employees, consultants, advisor, managers, directors or other persons who are part of the management of a party to the dispute are disqualified to be appointed as an arbitrator irrespective of what the arbitration agreement may provide.7 The Delhi High Court in a recent landmark judgement has confirmed this position. If an arbitration agreement provides for the appointment of a person who is ineligible for appointment by virtue of this provision, then the arbitration agreement will still remain valid and enforceable and the parties may mutually choose another arbitrator for the dispute (or the Court if the parties fail to reach an agreement).8

While this amendment in the law goes a step further to ensure that there is no bias or partiality in an arbitration, the law recognises that party autonomy is the most sacrosanct rule of arbitration. For example, let us assume that the parties wish to appoint a person as an arbitrator who is ineligible for appointment under the Seventh Schedule. In such a case, the parties are free to choose such person as the arbitrator if they so agree in writing after the dispute arises.9

This change has a far reaching impact for the construction industry as it balances the control that one party (generally the owner) used to exercise previously. In addition to this clause, the amended Arbitration Act has also re-vamped the arbitration procedure with respect to domestic and international arbitrations seated in India. For example, the principal changes which will impact the construction industry are: (a) fixed time-lines for completion of the arbitration proceedings and challenge of arbitral awards which should ensure that construction projects are not left in limbo for indefinite periods of time; (b) an increase in the powers of the arbitral tribunal for award of interim measure; (c) an exhaustive regime for costs based on the general rule that the unsuccessful party will be ordered to pay the costs of the successful party, thereby thwarting delaying tactic; and (d) the Court in relation to international arbitrations seated in India shall be the relevant High Court exercising jurisdiction over the dispute. It is pertinent to mention herein that the amended Arbitration Act shall only apply to Arbitration proceedings commenced after 23 October 201510 which means essentially that request for arbitration should be received by the Respondent after 23 October 2015.11

Thus, given the nature and inherent complexity of construction disputes, the construction industry is ideally placed to reap the benefits of arbitration as a mode of dispute resolution. For example, the parties are at liberty to appoint a technically qualified arbitrator specialising in delay claims on the arbitral tribunal, which simplifies the procedural aspects of dispute resolution because the tribunal is better equipped to handle expert evidence and submissions on complicated and technical delay analysis claims. Another very effective feature of the Arbitration Act is that the arbitrator can encourage settlement of the dispute between the parties during any stage of the arbitration.12 If the parties reach a settlement and so desire, the terms of such settlement can be recorded in an award of the tribunal.13 This technique has become popular the world over and is utilised as a helpful tool for dispute resolution.

Thus, arbitration of complex construction disputes is a pivotal strategic decision which can minimise the cost and time impact of prolonged disputes in a project and provide a definitive and binding determination of the dispute.

Footnotes

1. Global Construction 2030 – a global forecast for the construction industry to 2030 by PricewaterhouseCoopers.

2. Reported by Business Standard, 30 May 2015.

3. Section 11(2) of the Arbitration Act.

4. ACE Pipeline Contracts (P) Ltd v. Bharat Petroleum Corporation Ltd (2007) 5 SCC 304.

5. This has been held in a number of decisions of the Court, inter alia, Indian Oil Corporation Ltd v. Raja Transport Pvt Ltd (2009) 8 SCC 520, Ladli Construction Co. (P) Ltd v. Punjab Police Housing Corporation Ltd (2012) 4 SCC 609, Secy. to Govt., Transport Deptt v. Munuswamy Mudaliar 1988 Supp SCC 651, S. Rajan v. State of Kerala (1992) 3 SCC 608.

6. Section 12(5) of the amended Arbitration Act.

7. Rule 1 & 12 of the Seventh Schedule of the amended Arbitration Act.

8. Orissa Concrete and Allied Industries Ltd v. Union of India & Anr 2016 SCC OnLine Del 3463

9. Section 12(5) of the amended Arbitration Act.

10. Section 26 of the Arbitration and Conciliation Amendment Act 2016.

11. Section 21 of the amended Arbitration Act.

12. Section 30(1) of the amended Arbitration Act.

13. Section 30(2) of the amended Arbitration Act.

This article was first published in Property Observer Magazine - September 2016."

The content of this document do not necessarily reflect the views/position of Khaitan & Co but remain solely those of the author(s). For any further queries or follow up please contact Khaitan & Co at legalalerts@khaitanco.com

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
Nishith Desai Associates
 
In association with
Practice Guides
by Mondaq Advice Centres
Relevancy Powered by MondaqAI
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Nishith Desai Associates
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Mondaq Free Registration
Gain access to Mondaq global archive of over 375,000 articles covering 200 countries with a personalised News Alert and automatic login on this device.
Mondaq News Alert (some suggested topics and region)
Select Topics
Registration (please scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions